Skip to content
Garage 2 ramps · 31 Spanish Town Road +1 876 923 7740 Book ramp timeBook

Quote second · 23 jobs

Jobs and price bands

These are the bands we quote inside, parts and labour together, in JMD. The bottom of a band is a small Japanese saloon; the top is a big SUV or a European car where the part costs three times as much. Your number comes after the check, and it sits somewhere on this line.

Brakes

Front pads and discs

Pads and discs both sides, hubs cleaned, bedded in on the road test.

Back in the box: Your old pads and discs

14,500 – 26,000parts and labour

Same day
1.5 h labour

Brakes

Rear pads or shoes

Pads, or shoes and a drum clean, with the handbrake reset.

Back in the box: Your old pads or shoes

9,500 – 18,000parts and labour

Same day
1.5 h labour

Brakes

Brake calliper, one side

Seized calliper replaced or rebuilt, one side, with fluid and bleed.

Back in the box: The old calliper

18,000 – 34,000parts and labour

Same day
2 h labour

Brakes

Brake hoses and fluid change

Flexible hoses replaced, system flushed with new fluid.

Back in the box: The old hoses

9,500 – 16,000parts and labour

Same day
1.5 h labour

Cooling and AC

Radiator and thermostat

Radiator, thermostat, hoses checked, system filled and bled properly.

Back in the box: The old radiator and thermostat

26,500 – 48,000parts and labour

Same day
3 h labour

Cooling and AC

Cooling fan, relay and sensor

The fan that will not come on in traffic: motor, relay or sensor.

Back in the box: Whichever of the three had failed

15,500 – 34,000parts and labour

Same day
2 h labour

Cooling and AC

AC regas, dye and leak check

Vacuum, weighed charge, dye in, and you come back in a week.

Back in the box: Nothing comes off the car for this one

12,500 – 19,000parts and labour

Same day
1.5 h labour

Cooling and AC

AC compressor and drier

Compressor, drier and expansion valve together, system flushed.

Back in the box: The old compressor and drier

46,000 – 88,000parts and labour

Two days
4 h labour

Engine

Ignition coils and plugs

The dead coil, or all of them, with a set of plugs.

Back in the box: The old coils and plugs

15,500 – 38,000parts and labour

Same day
1.5 h labour

Engine

Oxygen sensor

The sensor the scanner names, cut out and replaced, then the fuel trims read back.

Back in the box: The old sensor

14,500 – 28,000parts and labour

Same day
1 h labour

Engine

Timing belt, tensioner and water pump

Belt, tensioner, idlers and water pump together, timing marks checked twice.

Back in the box: The old belt, pump and tensioner

48,000 – 86,000parts and labour

Two days
5 h labour

Engine

Exhaust flex pipe and mid-section

Flex joint or mid-section cut out and welded in, not patched.

Back in the box: The cut-out section

8,500 – 17,000parts and labour

Same day
1.5 h labour

Engine

Engine or gearbox mount

The collapsed mount, with the engine held on the jack while it goes in.

Back in the box: The collapsed mount

13,500 – 26,000parts and labour

Same day
2 h labour

Engine

Service: oil, filters and fluids

Oil, filters, fluids and a written list of what is coming next.

Back in the box: The old filters

12,500 – 22,000parts and labour

Same day
1.5 h labour

Starting and charging

Battery, terminals and earth strap

Battery, clean terminals, new earth strap where it is corroded.

Back in the box: The old battery, unless you leave it for the core refund

16,500 – 32,000parts and labour

Same day
0.5 h labour

Starting and charging

Alternator, rebuilt or new

Rebuild with brushes and a regulator, or a new unit if the rotor is gone.

Back in the box: The old alternator or its worn brushes

32,000 – 68,000parts and labour

Same day
2.5 h labour

Starting and charging

Starter motor

Starter off, solenoid and brushes, or a reconditioned unit fitted.

Back in the box: The old starter motor

24,000 – 52,000parts and labour

Same day
2 h labour

Steering and suspension

Wheels balanced and aligned

Four wheels balanced, toe and camber set to the maker's figures.

Back in the box: Old wheel weights, if you want them

6,500 – 9,500parts and labour

Same day
1 h labour

Steering and suspension

Lower arm and ball joint, one side

Arm and joint as one part where it is pressed in, then aligned.

Back in the box: The old arm and joint

17,500 – 31,000parts and labour

Same day
2 h labour

Steering and suspension

Shock absorbers, pair

Always in pairs, with top mounts and bump stops checked.

Back in the box: Both old shocks

28,000 – 56,000parts and labour

Same day
3 h labour

Steering and suspension

Wheel bearing, one side

Pressed or hub-type bearing, one side, with the hub cleaned up.

Back in the box: The old bearing or hub

16,000 – 29,000parts and labour

Same day
2 h labour

Transmission

Clutch kit and release bearing

Plate, cover and release bearing, with the flywheel checked while it is out.

Back in the box: The old plate, cover and bearing

62,000 – 110,000parts and labour

Two days
6 h labour

Transmission

CV joint or driveshaft, one side

Outer joint and boot, or a complete shaft where the splines are worn.

Back in the box: The old joint or shaft

19,500 – 36,000parts and labour

Same day
2 h labour

Showing all 23 jobs.

What is inside a band

Where the money goes

Two things make a price: the part and the hours. Both are written on your quote, so you can see which one you are arguing with.

Labour

JMD 4,500 an hour, charged in half hours

The hours on the quote are the hours the job takes, not the hours the book says. If it goes quicker than quoted, the invoice is the quote — we do not bill you for a struggle we did not have.

Parts

Priced three ways where a choice exists: original, a brand we know, and a sound used part. Anything that steers, stops or holds a wheel on gets original or a brand we know, and we will not fit a used one for you even if you ask.

Not in the band

Tyres, glass, body panels and paint. We do not do them here; we will tell you who does and we do not take a cut for the introduction.

The check

Comes off the bill. A JMD 4,500 scan on a job in the bands above means the job is 4,500 cheaper than the band says.

Book the check first Which job is it likely to be?